Project Summary
General Mills Expansion

Bringing some of the most recognized brands to households including Cheerios, Pillsbury, Betty Crocker, & Blue Buffalo.

Add Favorite

The Space
Square Footage 51,000
Location Covington, GA
The manufacturing giant's expansion includes a warehouse and chiller building to support a new cereal production line. Located on the northeast corner of the existing North Delta Production building, the expanded area includes loading docks along the north wall and storage space for the facility. The chiller building houses an electrical room with mechanical equipment space and an ammonia chiller room. The design-build facility function of this project is the first stage in a multi-stage program to bring this expansion into production. As in all projects of this type, sanitary design and construction principles are of the utmost importance. The truck entrance and trailer parking adds two lanes of entrance and exit traffic. To keep two lanes of traffic functioning at all times, the project takes place in three phases. Trailer parking is expanded to an existing gravel parking lot with concrete dolly pads. A fire lane is installed along with a hydrant and perimeter fencing with an owner-furnished access control gate.
Contact

We want to hear from you! Whether you have questions about this project, want to reach a particular team member or office, or want to learn more about our services, please let us know how we can serve you.

Project Contact

  • This field is for validation purposes and should be left unchanged.

Audi of Rockville

Repeat Client, Sonic Automotive, partners with Choate to renovate their existing dealership in Rockville, MD.

Register

  • This field is for validation purposes and should be left unchanged.