To mitigate disruption to tenants throughout the rest of the building, Choate coordinated closely with the buildings facility team on the construction schedule and critical path of this office renovation. As a solution, Choate worked off-hours throughout the project to alleviate the impact of construction noise during regular business hours.
As the renovation work was conducted below ground without exterior access, all construction materials had to be small enough to fit inside the elevator to be brought to the worksite. The subgrade factor presented an opportunity for the project team to get creative with the sequencing and material delivery schedule. Working with the design team, Choate created a schedule that facilitated materials arriving on site in smaller pieces in order to fit in the freight elevator. For example, all structural steel was delivered in smaller spans, and then assembled using hoisting equipment once inside the amenity space.
Inside the Amenities Center, the project team constructed a conference facility designed with the flexibility to either host up to 200 people or transform into smaller breakout spaces for multiple, simultaneous meetings.
Additionally, the interior renovation included construction of a state-of-the-art fitness center featuring high-end cardiovascular equipment, free weights, floor exercise areas, and spa-like locker rooms.
Rounding out this corporate interiors project, the space provides a lounge for tenants to gather featuring gaming tables and fully-stocked kitchen facilities.