


Expanding Facilities and Blending the Old with the New
The tilt-wall and structural steel facility is used for assembly and distribution of tire/wheel assemblies and transmissions for multiple national automotive fleets. Exterior walls are complemented by textured paint, clerestory windows in the warehouse space, and punched openings. The distribution area is equipped with 25-dock positions and a drive-in ramp and door. A 7,271-SF interior upfit adds offices, workstations, conference rooms, administrative space, breakrooms, and restrooms to the facility.







