

Site-Specific Solutions
Buildings 1, 2, and 3 were strategically developed on a shared site with significant grading and retaining wall requirements. Infrastructure improvements, including a public roadway crossing a stream and a RidgeRock retaining wall system, helped optimize the site while supporting future growth.
Modern Logistics Features
Each warehouse includes a speculative office upfit designed to accommodate future tenants and streamline occupancy. Paved truck courts enhance circulation and maneuverability throughout the development, while Building 1 features dedicated trailer storage and a dolly strip to support efficient logistics operations.







