In partnership with Childress Klein, Choate constructs three industrial facilities totaling more than 1.4 million SF as part of a multi-phase project on Camp Hall’s Campus 8. Tilt-wall structures Building A (968,000 SF), Building B (273,000 SF), and Building C (182,000 SF) are built concurrently, connected through a seamless network of transportation infrastructure, benefitting from quick access to the ports, railways, and I-26 Interchange the campus provides.
Combined, these 3 industrial facilities offer 282 dock doors with 185 feet of truck court space per building. Boasting easy access to the global marketplace via rail, road, sea, or air, Camp Hall significantly bolsters both the local community and region through increased job opportunities and optimized distribution operations.
Also on the campus, the project team constructs a 544,600-SF “ambient temperature” spec warehouse featuring a cross dock design layout, 40-foot clear heights and 5 electrical make-up air units. This tilt-wall structure features 9.25-inch thick walls for the loading docks, and 11.25-inch thick walls elsewhere designed to withstand the wind and seismic conditions in Charleston. Camp Hall 5 offers 83 8×10-foot roll-up dock doors, 4 12×14-foot ramp doors, with one 1,750-SF tenant office buildout included.
We want to hear from you! Whether you have questions about this project, want to reach a particular team member or office, or want to learn more about our services, please let us know how we can serve you.
Simultaneously constructing two distribution facilities in the market’s first Class A industrial park.