Toyota Mall of Georgia Service Center and Parking Deck

This project consists of 3 levels. The lower level houses car detail bays and locker rooms. The second level has the parts department and the main service center. The 3rd level, the roof, is pre-cast double Tee construction to allow vehicle inventory storage. The structural frame is a combination of concrete foundation walls and footings with structural steel supporting the parts department. Pre-cast double Tees are employed at the roof level with a topping slab. Exterior walls are pre-cast panels with brick inserts.

Construction of a 385 space pre-cast parking deck for inventory storage. This is a cast in place with a concrete foundation on a very difficult site. The project features metal stairs with tension cable rails.